Blog

Euskalforging Flanges for 1.4 GW East Anglia Three Offshore Wind Farm | Offshore Wind

Spain-based manufacturer of rolled rings euskalforging has been awarded a contract to supply flanges for the 1.4 GW East Anglia Three offshore wind farm in the UK.

Within the scope of the project, the company will ring roll a total of 235 flanges as transition piece (TP) top flanges, TP bottom flanges, and monopile flanges with > 8000 mm outside diameter and up to 37,000 kg. Split Flange

Euskalforging Flanges for 1.4 GW East Anglia Three Offshore Wind Farm | Offshore Wind

The flanges will be delivered to companies Windar, Navantia, and Haizea in Spain where the project will be concluded.

Haizea will supply 50 monopiles while Navantia Seanergies and Windar will manufacture 45 units for the East Anglia Three offshore wind project.

Seaway 7 is responsible for the transportation and installation of foundations and inter-array cables under a contract signed with ScottishPower Renewables, Iberdrola’s UK arm, in July.

The offshore wind project will feature 95 Siemens Gamesa 14+MW wind turbines installed approximately 70 kilometres from shore in the southern North Sea.

East Anglia Three is part of ScottishPower Renewables’ GBP 6.5 billion (around EUR 7.4 billion) East Anglia Hub development which also includes two other offshore wind farms: the 800 MW East Anglia One North and the 900 MW East Anglia Two.

The offshore wind farm is expected to be fully operational in 2026 and, once up and running, the 1.4 GW project will become the second-largest offshore wind farm in the world.

Get in front of your target audience in one move! OffshoreWIND.biz is read by thousands of offshore wind professionals daily.

Daily news and in-depth stories in your inbox

Euskalforging Flanges for 1.4 GW East Anglia Three Offshore Wind Farm | Offshore Wind

JIC 74°Cone Flared Tube Fitting FICEP is an Italian industrial company with nearly one hundred years of experience, world leader in technologies for the steel construction and forging industries. The company, which manufactures its machines and equipment in-house, operates over an area of 145,000 square meters, directly handling the design, engineering, machining, surface treatments, assembly and installation of its machines. […]